A forecast is a planning signal. A booking is a commitment. This article maps the path from OEM forecast to firm booking request to confirmation, and the conditions under which a carrier can confirm without manual review.

Written for: Commercial directors and trade management at carriers with OEM contracts

Contents
  1. The path from forecast to booking
  2. Conditions for confirming without a person
  3. What the manufacturer should see
  4. Quick answers
  5. Why this capability matters

A manufacturer's logistics lead sends a production forecast and waits. Two days later a confirmation arrives, or a question, or nothing. On the carrier side, someone has matched the forecast against the contract by hand and checked the voyage.

Both sides want the same thing: a fast answer they can rely on. The way to get there is to separate planning from commitment. The forecast tells the carrier what is coming. The firm booking request, or nomination, is what the carrier confirms. Agree which requests can be confirmed under fixed rules, and which need a person.

The path from forecast to booking

From forecast to booking

1
Forecast receivedEDI, API or uploaded file
2
Planned against the contractVolume, period, cargo types and lanes against allocation. A plan, not yet a booking.
3
Firm booking requestUnits nominated for a specific sailing by the manufacturer or its logistics provider
4
Checked against the voyageSpace of the right kind on the planned sailing; cargo data complete
All confirmation conditions met?
YesConfirmed under agreed rulesNominated, within allocation, space available, cargo data complete, no open issue
NoRouted to the commercial teamWith the reason: beyond allocation, no space, data missing
5
Booked and trackedBooking carries the contract reference; allocation use stays current
IllustrativeA forecast plans capacity; a firm booking request asks for it. Confirmation without a person only happens when every agreed condition is met. Everything else is routed, not rejected.

1. Forecast received. By EDI from larger manufacturers, or as an uploaded file from smaller ones. See EDI, API or upload? for the choice of channel.

2. Planned against the contract. Volume, period, cargo types and lanes are compared with the agreed allocation. The result is a capacity plan, not yet a booking.

3. Firm booking request. The manufacturer, or its logistics provider, nominates specific units for a specific sailing. Unless the contract says a forecast is binding, this is the step that asks the carrier for a commitment.

4. Checked against the voyage. Is there space of the right kind on the planned sailing, and is the cargo data complete?

5. Confirmed or routed. Requests within allocation, with space available and complete cargo data, can be confirmed under agreed rules. Everything else goes to the commercial team.

6. Booked and tracked. The booking carries the contract reference, so allocation use stays current. Changes and cancellations follow the same rules as the original request.

Conditions for confirming without a person

Requests outside these conditions are not rejected. They are routed. A request beyond allocation is a commercial decision, covered in Beyond contract allocation.

What the manufacturer should see

  • Which volumes are confirmed, and on which sailing.
  • Which are waiting, and why.
  • How much of the allocation is used for the period.

A clear status on waiting requests reduces follow-up calls, even when the answer is not yet yes.

Quick answers

What is the difference between a forecast and a booking in RoRo shipping?

A forecast is a planning signal. A firm booking request, or nomination, names units for a specific sailing and asks the carrier for a commitment, unless the contract makes the forecast binding.

When can a carrier confirm a booking request without manual review?

When a nomination exists, the volume is within allocation for the period, space is available for the cargo type on the planned voyage, cargo data is complete and there is no open credit or contract issue.

What happens to requests that fail those conditions?

They are routed to the commercial team, not rejected. A request beyond allocation is a commercial decision.

Why this capability matters

Manufacturers judge a carrier by how quickly and reliably it answers. Matching forecasts to contracts by hand slows the answer and ties up the commercial team. Clear rules for what can be confirmed, and what needs a person, give faster answers and free the team for the decisions that matter.

Written by the Cartagena team behind CargoVerse. Several of us have worked in the RoRo shipping industry before building software for it.

Map one OEM forecast

Follow one manufacturer's forecast from receipt to confirmed booking. Note where it waited and who decided. Bring the map to a conversation with us.